Installing a Saniplus
![]() |
![]() |
![]() |
![]() |
| 1 | 2 | 3 | 4 |
| An assembly of all parts of the Saniplus. |
An assembly of all parts of the toilet. |
Cut off the lid of the vent tapping. |
Insert push button into breather opening. |
![]() |
![]() |
![]() |
|
| 12 | 5 | ||
| This is the vent connection. | Place the cover onto the breather. |
||
![]() |
![]() |
||
| 11 | 6 | ||
| Water level mark inside toilet tank. |
Showing the flapper check valve. |
||
![]() |
![]() |
![]() |
![]() |
| 10 | 9 | 8 | 7 |
| Note: Discharge elbow sitting flush on top of lid. | Extension pipe between toilet and macerator. | Connection to the sewer pipe. |
Elbow pushed onto collar until shoulder hits lid. |
Note: You must have Real Player installed to view the video. Should you wish to Download the Video to your computer, click on the link above and if using Internet Explorer "Right click" and "Save Target As".




















